The development of the Production-Warehouse Facility with a Cold Store
Main Facts
Investor: Sokołów S. A.
Performed works: earthworks, foundation works, prefabricated ferroconcrete structure, suspended ceilings, substructures for floors, resin floors, woodwork and ironwork, wod-kan, c.o. and c.t. installations, electric, ventilation and cooling installations
Implementation time: April 2020-July 2021
Implementation description:
The investment implemented by GIGA as a general contractor for Sokołów S.A. As part of the investment conducted in the operating plant, the complete scope of the construction works was carried out (among other things: earthworks, substructures for roads and roads, foundations, a prefabricated ferroconcrete structure, sandwich panel light casing, suspended ceilings, resin floors, woodwork and ironwork, pedestals, stops, docks for trucks), electric and sanitary works (technological, water, sewage), as well as the necessary ventilation and cooling installations. In some rooms, ammonia coolers were mounted, which allowed to maintain the temperature of -4oC and glycol coolers ensuring the temperature of 0oC. A newly-erected building extended the total area of the plant by 11 800 m2 and it consists of a production, warehouse and office part. This investment was implemented based on the ready-made documentation and own designs.