Main Facts:

Investor: “Polmos” Żyrardów

Performed works: repairing earthing and lightning installation, relocating the Low Voltage Main Switching Station (RGNN), lighting installation, RGNN and Medium Voltage Main Switching Station (RGSN) installations, 15kV transformer station, emergency power supply, fire alarm installation power supply, as-built measurements
Implementation time: June 2000-October 2001

Implementation description:

Comprehensive modernisation works within power engineering implemented to the order of Żyrardowskie Zakłady Przemysłu Spirytusowego “Polmos” (Spirits Industry Plants in Żyrardów). The scope of works was divided into a few agreements on

  • the repair of the earthing and lightning installations
  • the performance of 15kV transformer station
  • the installation of indoor and outdoor lighting system
  • the delivery and assembly of RGNN and RGSN
  • the performance of emergency and fire power supply
  • the performance of as-built measurements and technical documentation