Main Facts

Investor: Sokołów S. A.

Performed works: earthworks, foundations, ferroconcrete structure, sandwich panel casing, resin flooring, protective pedestals, cargo cranes, window and door woodwork, sanitary, ventilation, air-conditioning, cooling, electric, telecommunication, road works, and land development
Implementation time: May 2011-April 2012

Implementation description:

An investment in the premises of the operating production plant in Sokołów Podlaski. The structure of the facility was made from the pre-tensioned pre-stressed, monolithic and steel concrete elements in sandwich panel casing. The full scope of the sanitary, power, electric and telecommunication networks and installations was carried out, as well as finishing works, among other things, industrial floors, stainless steel finishing and land development. This investment was implemented in accordance with the following quality standards: ISO and HACCP. Construction based on the ready-made documentation and own designs.